FORBUD Company has been running its business on construction market since 1986.

During this period it was structurally and organizationally transformed adjusting itself to the growing requirements on the construction market.
Read more...
 
 
A detached house in Kamionki near Poznań – standard Create PDF- SPRING Print Helical spring - Recommend the acquaintance

Completion Standard

I The building:

1. One-storey building with a functional attic.

2. Building construction – traditional, external multi-layer walls, clay hollow brick 25 cm thick made of cement-calcareous mortar, 10 cm thick mineral wool insulation and finished with 12 cm thick elevation of clinker brick.

 
3. Densely-ribbed ceiling between floors – Teriva Nova.

 
4.Internal stairs made of reinforced concrete, monolithic.


5.Internal construction walls – clay hollow brick 25cm in thickness.


6.Internal dividing walls – clay hollow bricks 6 and 12 cm thick, on the upper floor made of gypsum-clinker panels on steel grillage with mineral wool filling.

 
7.Chimneys made of full brick, clinker brick over the roof surface.


8.Roof construction – woodworks construction made of pine or spruce tree wood class C 30.


9.Roof covering – cement tiles type Braas made in Środa Wielkopolska in red color.


II Furnishing and equipment:

1. Floors – cement floor.

2. Joinery:

  • Garage gate – steel, lifted up.
  • PCV windows in white color equipped with external roller blinds.
  • Front anti-burglar door with fitting in white

 
3. Window sills:

  • External - 19 cm long profiles.
  • Internal PCV in white color.

 
4. Plasters:

  • Internal – gypsum.

 

5. Kitchen furnishing:

  • Water/sewage systems installation + electrical wiring.
  • Gas supply system.

 
6. Bathroom and toilet furnishing.

  • Installation points system.
  • Water supply outlets.

 
7. Water supply installation: polypropylene plumb-lines, built in floor type Z PE-X.


8. Central heating installation:

  • Distribution system in floors  / PE-X pipes/ with single function gas furnace with electronic ignition by Viessmann and  120l cubic capacity heat exchanger.
  • Steel plate radiators with thermostatic heads.

 
9. Electricity supply system made of copper wires placed under plaster.


10. Division of installations into circuits:

  • Lighting.
  • Plug-in sockets.

11. Under-plaster fittings.


12. Doorbell signaling installation.


13. Intercom installation.


14. Radio and television installation – single antenna plug.


 
III Land development plan:

  • underground reinforced concrete tank – septic tank without water outlet.
  • from the limits of the lot to the main entrance a 1,20 m wide path made of gray set stone 6 cm thick.
  • around the building a  band of Gray set stone, 6 cm thick - 0,50 m wide.
  • lawns + greenery architecture, garage drive made of gray concrete set stone 6 cm thick.
  • 3 sides – coated wire fence; front – posts and clinker underpinning + wooden filling

 

 